Zip cord
Zip-cord is sometimes used to describe a type of electrical or optical cable in which two or more conductors are held together by a single insulating jacket that can be easily separated by pulling them apart like a zip. The term is most common in the US but also used in the UK, in Australia the same cord might be called a figure-8 cable. The separable design keeps related conductors together, reducing< tangling for simple handling, with the option to separate them.
Some times each side of the cord will be coloured so as to keep track of which is which over a long length, these are mostly used in sound speakers but also as lamp or lighting cables cords, but only in temporary installations or mobile applications such as concerts, exhibitions etc not as a permanent installation.
[edit] Related articles on Designing Buildings
- Arcing.
- Articles about electricity.
- Earthing.
- ECA articles.
- Electric.
- Electrical appliance.
- Electrical conduit.
- Electrical consumption.
- Electrical energy.
- Electrical equipment.
- Electrical installation.
- Electrical power.
- Electrical safety.
- Electrical wiring.
- Electrician.
- Electricity bill.
- Electrotechnical Assessment Specification guidance for installers.
- Grommet.
- IET announces release of 18th Edition Amendment 2.
- Panelboard.
- Premises wiring system.
- Ring circuit.
- Safe isolation for low voltage.
- What to know about foundation earthing.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
















