Zip cord
Zip-cord is sometimes used to describe a type of electrical or optical cable in which two or more conductors are held together by a single insulating jacket that can be easily separated by pulling them apart like a zip. The term is most common in the US but also used in the UK, in Australia the same cord might be called a figure-8 cable. The separable design keeps related conductors together, reducing< tangling for simple handling, with the option to separate them.
Some times each side of the cord will be coloured so as to keep track of which is which over a long length, these are mostly used in sound speakers but also as lamp or lighting cables cords, but only in temporary installations or mobile applications such as concerts, exhibitions etc not as a permanent installation.
[edit] Related articles on Designing Buildings
- Arcing.
- Articles about electricity.
- Earthing.
- ECA articles.
- Electric.
- Electrical appliance.
- Electrical conduit.
- Electrical consumption.
- Electrical energy.
- Electrical equipment.
- Electrical installation.
- Electrical power.
- Electrical safety.
- Electrical wiring.
- Electrician.
- Electricity bill.
- Electrotechnical Assessment Specification guidance for installers.
- Grommet.
- IET announces release of 18th Edition Amendment 2.
- Panelboard.
- Premises wiring system.
- Ring circuit.
- Safe isolation for low voltage.
- What to know about foundation earthing.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.